The question that keeps nagging me about the Piketon, Ohio project: which of the three giants blinks first? SoftBank, OpenAI and Nvidia have woven themselves into one knot on that land, and any single failure drags the other two down with it. History sits under the dirt there. A Cold War uranium enrichment plant ran on that spot for roughly forty years, and the federal government still holds the deed while the old structure gets dismantled. SB Energy, SoftBank's energy arm, wants to raise one of the largest AI campuses ever pitched on top of it. The computing load is 8 gigawatts. Feeding it means 9.2 gigawatts of fresh natural gas generation. OpenAI locked in a twenty-year lease, and Nvidia is the only chip supplier named. Now the finances. SoftBank's credit default swaps imply close to a 1 in 3 chance it defaults, and it just absorbed a $7 billion quarterly loss. OpenAI pulled in $10 billion in revenue last quarter while posting a $10.9 billion adjusted operating loss, per the Wall Street Journal, and it still has no investment-grade credit rating. So Nvidia backstops the rent. Its filing discloses up to $105 billion in guarantees for the OpenAI campus, and those stay until OpenAI earns a satisfactory credit rating. On Friday, Reuters reported SEC enforcement staff are reviewing possible accounting issues at Nvidia. Then the circle closes. OpenAI put $500 million into SB Energy, so the tenant owns part of its landlord. Nvidia plans another $1.5 billion, so the guarantor owns a piece too. SoftBank holds about 13% of OpenAI. Masayoshi Son showed up for the March groundbreaking. Satellite images from February through July found no graded pads, no foundations on the old plant's footprint. One tracker counted zero megawatts confirmed under construction. The paper schedule runs long. Environmental review isn't expected to wrap until January 2027, the first 800 megawatts aren't due until 2028, and the utility expects grid power in 2029. Run the failure cases. OpenAI can't pay, Nvidia could owe up to $105 billion. Nvidia pulls back, the lease loses the backing that made it possible. SoftBank can't keep funding SB Energy, the landlord can't build. The campus slips, OpenAI's compute plans slip with it, along with the valuation SoftBank is borrowing against. Three of the biggest names in AI, one twenty-year lease, and a field that was still a demolition site this summer. #SoftBankGroup
30m
The question that keeps nagging me about the Piketon, Ohio project: which of the three giants blinks first? SoftBank, OpenAI and Nvidia have woven themselves into one knot on that land, and any single failure drags the other two down with it. History sits under the dirt there. A Cold War uranium enrichment plant ran on that spot for roughly forty years, and the federal government still holds the deed while the old structure gets dismantled. SB Energy, SoftBank's energy arm, wants to raise one of the largest AI campuses ever pitched on top of it. The computing load is 8 gigawatts. Feeding it means 9.2 gigawatts of fresh natural gas generation. OpenAI locked in a twenty-year lease, and Nvidia is the only chip supplier named. Now the finances. SoftBank's credit default swaps imply close to a 1 in 3 chance it defaults, and it just absorbed a $7 billion quarterly loss. OpenAI pulled in $10 billion in revenue last quarter while posting a $10.9 billion adjusted operating loss, per the Wall Street Journal, and it still has no investment-grade credit rating. So Nvidia backstops the rent. Its filing discloses up to $105 billion in guarantees for the OpenAI campus, and those stay until OpenAI earns a satisfactory credit rating. On Friday, Reuters reported SEC enforcement staff are reviewing possible accounting issues at Nvidia. Then the circle closes. OpenAI put $500 million into SB Energy, so the tenant owns part of its landlord. Nvidia plans another $1.5 billion, so the guarantor owns a piece too. SoftBank holds about 13% of OpenAI. Masayoshi Son showed up for the March groundbreaking. Satellite images from February through July found no graded pads, no foundations on the old plant's footprint. One tracker counted zero megawatts confirmed under construction. The paper schedule runs long. Environmental review isn't expected to wrap until January 2027, the first 800 megawatts aren't due until 2028, and the utility expects grid power in 2029. Run the failure cases. OpenAI can't pay, Nvidia could owe up to $105 billion. Nvidia pulls back, the lease loses the backing that made it possible. SoftBank can't keep funding SB Energy, the landlord can't build. The campus slips, OpenAI's compute plans slip with it, along with the valuation SoftBank is borrowing against. Three of the biggest names in AI, one twenty-year lease, and a field that was still a demolition site this summer. #SoftBankGroup
30m
No comments yet. Be the first!
Comments
No comments yet. Be the first!